๐ขเชเชเซ เชธเชพเชเชเซ 7 เชตเชพเชเซ
เชเช ๐นเชคเซเชฐ 6 เชจเชฟเชถเชพเชจ ๐ฏ
๐ฅSPECIAL BATCH FOR
๐ทโโ๏ธAMC EXAMS
๐๏ธBATCH STARTS FROM 12th JANUARY 2026
2๏ธโฃnd FREE DEMO LECTURE
by โจ HARSHIL SIR
๐๏ธDate : 10/01/2026
โฐTime : 07:00 PM
๐Demo Lectures Link
https://websankulcivilengineering.akamai.net.in/new-courses/82
๐ Orientation Session Link
https://www.youtube.com/live/upaGdYwJXQU?si=Ej1PJsBVspel8-f5
๐ AMC ESTATE DEPARTMENT THEORY AND QUESTION PRACTICE BOOK DEMO COPY LINK
https://t.me/websankul_civil_engineering
๐ฑCONTACT US
72018 66333
เชเช ๐นเชคเซเชฐ 6 เชจเชฟเชถเชพเชจ ๐ฏ
๐ฅSPECIAL BATCH FOR
๐ทโโ๏ธAMC EXAMS
๐๏ธBATCH STARTS FROM 12th JANUARY 2026
2๏ธโฃnd FREE DEMO LECTURE
by โจ HARSHIL SIR
๐๏ธDate : 10/01/2026
โฐTime : 07:00 PM
๐Demo Lectures Link
https://websankulcivilengineering.akamai.net.in/new-courses/82
๐ Orientation Session Link
https://www.youtube.com/live/upaGdYwJXQU?si=Ej1PJsBVspel8-f5
๐ AMC ESTATE DEPARTMENT THEORY AND QUESTION PRACTICE BOOK DEMO COPY LINK
https://t.me/websankul_civil_engineering
๐ฑCONTACT US
72018 66333
โค2๐2
โ
DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEER๐ท๐ป-824 POSTS-(ADVT NO. :-303/202526)
The soundness of cement is mainly affected by excess
Anonymous Quiz
17%
Silica
17%
Alumina
62%
Free lime
3%
Iron oxide
โค1
In CPM, the total number of dummy activities required depends on
Anonymous Quiz
82%
Logical dependency of activities
6%
Project duration
9%
Number of critical paths
3%
Number of events
The flow net consists of
Anonymous Quiz
92%
Flow lines and equipotential lines
5%
Streamlines only
3%
Flow gradients
1%
Pressure lines
The length of a traverse line is most accurately measured using
Anonymous Quiz
11%
Chain
6%
Tape
58%
EDM
24%
Prismatic compass
โค2
In a portal frame subjected to vertical loads only, sway occurs when
Anonymous Quiz
17%
Loads are symmetrical
19%
Supports are hinged
40%
Geometry is symmetrical
24%
Columns are unequal
The main advantage of ready-mix concrete is
Anonymous Quiz
4%
Low initial cost
78%
Better quality control
9%
Higher water content
9%
Faster setting
The probability of completing a project later than the scheduled time in PERT is obtained using
Anonymous Quiz
37%
Beta distribution
41%
Normal distribution
19%
Binomial distribution
4%
Poisson distribution
โค2
The minimum diameter of a public sewer should not be less than
Anonymous Quiz
14%
100 mm
25%
125 mm
50%
150 mm
10%
200 mm
The method of locating details by measuring angles and distances from a single station is called
Anonymous Quiz
25%
Traversing
25%
Intersection
16%
Resection
33%
Radiation
The bending moment at the fixed end of a cantilever carrying a point load at free end is
Anonymous Quiz
16%
WL/2
48%
WLยฒ/8
20%
Zero
15%
WL
โค3
The loss of prestress in concrete due to elastic shortening occurs
Anonymous Quiz
5%
During curing
15%
After hardening
17%
Due to creep
64%
Immediately after stressing
In network analysis, float available to an event is called
Anonymous Quiz
23%
Free float
27%
Total float
29%
Event slack
21%
Independent float
โค1
The main function of skimming tanks is to remove
Anonymous Quiz
4%
Grit
63%
Oil and grease
30%
Suspended solids
3%
Pathogens
In leveling, the reduced level of a point is independent of
Anonymous Quiz
21%
Benchmark RL
32%
Height of instrument
21%
Curvature correction
25%
Order of observations
The number of plastic hinges required for collapse of a statically determinate structure is
Anonymous Quiz
7%
One
9%
Two
44%
Equal to degree of indeterminacy
40%
One more than degree of indeterminacy
White cement differs from OPC mainly due to absence of
Anonymous Quiz
21%
Lime
15%
Alumina
53%
Iron oxide
11%
Silica
Negative total float indicates
Anonymous Quiz
83%
Project delay beyond target date
9%
Critical activity
6%
Early completion
2%
Idle resources
The main source of nitrogen in wastewater is
Anonymous Quiz
39%
Industrial waste
27%
Human excreta
5%
Surface runoff
29%
Groundwater infiltration