A permanent benchmark is generally marked on
Anonymous Quiz
5%
Wooden peg
85%
Stone or concrete pillar
8%
Temporary structure
2%
Tree trunk
The conjugate beam method is particularly useful when
Anonymous Quiz
6%
Loads are moving
43%
Support conditions are complex
47%
Multiple deflections are required
4%
Material is plastic
Demo copy AMC.pdf
14.8 MB
๐ DEMO COPY OF
โ ๏ธAMC ESTATE DEPARTMENT
THEORY AND QUESTION PRACTICE BOOK
๐ Buy Book From Here
https://websankulcivilengineering.akamai.net.in/books/4
๐ฑContact Us
72018 66333
โ ๏ธAMC ESTATE DEPARTMENT
THEORY AND QUESTION PRACTICE BOOK
๐ Buy Book From Here
https://websankulcivilengineering.akamai.net.in/books/4
๐ฑContact Us
72018 66333
โค5๐1
๐ เชเชตเซ เชเชพเช เชตเชฟเชฆเซเชฏเชพเชฐเซเชฅเซ เชฎเชฟเชคเซเชฐเซ LIVE
๐ฅSPECIAL BATCH FOR
๐ทโโ๏ธAMC EXAMS
2๏ธโฃnd FREE DEMO LECTURE
by โจ HARSHIL SIR
๐Demo Lectures Link
https://websankulcivilengineering.akamai.net.in/new-courses/82
๐ฑCONTACT US
72018 66333
๐ฅSPECIAL BATCH FOR
๐ทโโ๏ธAMC EXAMS
2๏ธโฃnd FREE DEMO LECTURE
by โจ HARSHIL SIR
๐Demo Lectures Link
https://websankulcivilengineering.akamai.net.in/new-courses/82
๐ฑCONTACT US
72018 66333
websankulcivilengineering.akamai.net.in
WebSankul Civil Engineering
Welcome to India's Premier institution established with the sole aim to initiate, enable and empower individuals to grow up to be extraordinary professionals.
โค2๐1
โ
DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEER๐ท๐ป-824 POSTS-(ADVT NO. :-303/202526)
Excessive alkalis in cement may cause
Anonymous Quiz
19%
Sulphate attack
7%
Delayed setting
7%
Flash setting
68%
Alkaliโaggregate reaction
In CPM networks, an activity having minimum total float is
Anonymous Quiz
8%
Most flexible
30%
Least critical
52%
Most critical
11%
Independent
โค2
Darcyโs law is valid only when flow through soil is
Anonymous Quiz
8%
Turbulent
76%
Laminar
8%
Unsteady
8%
Compressible
The most suitable method for plotting a traverse in surveying is
Anonymous Quiz
39%
Coordinates method
24%
Resection
21%
Radiation
16%
Intersection
โค2
A pin-jointed plane frame is statically determinate when
Anonymous Quiz
9%
m = 2j โ 2
21%
m = 2j โ 1
2%
m = j โ 1
67%
m = 2j โ 3
Use of water-reducing admixtures in concrete leads to
Anonymous Quiz
2%
Higher water demand
93%
Reduced water content at same workability
3%
Increased setting time only
2%
Lower strength
โค1
The expected project completion time in PERT corresponds to
Anonymous Quiz
61%
Mean duration of critical path
16%
Pessimistic duration
7%
Shortest path
16%
Longest optimistic path
In sewer design, minimum velocity at average flow is adopted to prevent
Anonymous Quiz
7%
Flooding
42%
Structural failure
47%
Silting
5%
Leakage
โค1
The line joining points of equal magnetic dip is called
Anonymous Quiz
12%
Isogon
75%
Isoclinic line
10%
Isohyet
3%
Contour
For a simply supported beam, the area under shear force diagram between two points represents
Anonymous Quiz
46%
Bending moment
16%
Slope
15%
Deflection
23%
Load intensity
๐4
The initial curing period is most critical for concrete because
Anonymous Quiz
4%
Creep occurs
20%
Drying shrinkage starts
5%
Carbonation occurs
72%
Maximum hydration takes place
โค2
In CPM, an activity with negative float indicates
Anonymous Quiz
20%
Ahead of schedule
62%
Project delay
16%
Dummy activity
2%
Free resource
The main purpose of tertiary treatment in sewage treatment is removal of
Anonymous Quiz
30%
Suspended solids
43%
Organic matter
21%
Nutrients
7%
Floating matter
โค1
In theodolite surveying, centering error is reduced by
Anonymous Quiz
1%
Longer sights
14%
Face left observations
11%
Repeating angles
75%
Using plumb bob accurately
โค1