The estimate prepared for additional works not included in the original estimate is called
Anonymous Quiz
20%
Revised estimate
9%
Detailed estimate
10%
Abstract estimate
61%
Supplementary estimate
β€1
π₯General Studies 2026
Selection Oriented Programme
ππ»4999/- β
FLAT 60% Off
ππ»Only @ 1999/- β
ππ» Validity Till Your Exam
πJoin Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/86
π±Contact Us
72018 66333
Selection Oriented Programme
ππ»4999/- β
FLAT 60% Off
ππ»Only @ 1999/- β
ππ» Validity Till Your Exam
πJoin Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/86
π±Contact Us
72018 66333
β€3
β
DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEERπ·π»-824 POSTS-(ADVT NO. :-303/202526)
The modulus of elasticity is defined as the ratio of
Anonymous Quiz
78%
Stress to strain
14%
Strain to stress
3%
Load to area
5%
Extension to length
In a fixed beam, the bending moment at the supports is
Anonymous Quiz
58%
Zero
19%
Maximum negative
19%
Maximum positive
4%
Same as mid-span
The fineness of cement is determined by
Anonymous Quiz
15%
Vicat apparatus
15%
Le-Chatelier apparatus
68%
Blaine air permeability test
1%
Slump cone
The method of plane table surveying used when the instrument station is already plotted is
Anonymous Quiz
32%
Resection
28%
Intersection
21%
Traversing
19%
Radiation
In PERT analysis, the measure of uncertainty in project completion time is expressed by
Anonymous Quiz
37%
Expected time
26%
Variance
18%
Total float
20%
Slack time
The strain energy stored per unit volume of a material is known as
Anonymous Quiz
21%
Proof resilience
65%
Modulus of resilience
12%
Modulus of rigidity
2%
Toughness
π1
The presence of clay in sand can be detected by
Anonymous Quiz
13%
Bulking test
26%
Sieve analysis
57%
Sedimentation test
4%
Colour test
β€2
The California Bearing Ratio (CBR) test is mainly used to determine
Anonymous Quiz
4%
Compressibility of soil
7%
Shear strength of soil
86%
Load-bearing capacity of subgrade soil
2%
Permeability of soil
The vertical member of a door shutter is known as
Anonymous Quiz
5%
Rail
21%
Panel
50%
Mullion
23%
Style
The minimum stopping sight distance (SSD) on a road depends mainly on
Anonymous Quiz
7%
Width of pavement
63%
Speed of vehicle
6%
Traffic volume
23%
Type of road surface only
The temporary adjustment of a dumpy level includes
Anonymous Quiz
30%
Orientation, centering, and levelling
12%
Levelling, plunging, and ranging
8%
Focusing, ranging, and plunging
49%
Centering, levelling, and focusing
π3
The plasticity index of soil is the numerical difference between
Anonymous Quiz
9%
Liquid limit and shrinkage limit
17%
Plastic limit and shrinkage limit
60%
Liquid limit and plastic limit
14%
Natural water content and liquid limit
The process of reducing water absorption of concrete surface by applying chemicals is called
Anonymous Quiz
16%
Sealing
68%
Waterproofing
4%
Finishing
13%
Curing
π3π―3π1
The component provided at the top of a parapet wall to prevent rainwater penetration is
Anonymous Quiz
61%
Coping
12%
Cornice
4%
Plinth beam
23%
Weathering course
π1π1
The quantity of earthwork is generally calculated by
Anonymous Quiz
13%
Centre line method
31%
Long wallβshort wall method
24%
Mid-sectional area method
32%
Trapezoidal rule
π3π1
The relative density of cohesionless soil is determined by
Anonymous Quiz
18%
Proctor test
18%
Vane shear test
35%
Consolidation test
28%
Density index test