π₯Special Batch for
π·ββοΈAMC - ATS/AE/ACE
πΉASSISTANT TECHNICAL SUPERVISOR
β 474 POSTS
πΉASSISTANT ENGINEER
β 71 POSTS
πΉASSISTANT CITY ENGINEER
β 27 POSTS
β¨BATCH HIGHLIGHTS:
π LIVE + RECORDED LECTURES
π QUESTION PRACTICE BOOK FOR ATS/AE/ACE
πTEST SERIES AS PER SYLLABUS AND EXAM PATTERN
βΆοΈFEES - 4999/-
ππ»Join Batch Nowππ»
https://websankulcivilengineering.akamai.net.in/new-courses/83
π±Contact Us
72018 66333
π·ββοΈAMC - ATS/AE/ACE
πΉASSISTANT TECHNICAL SUPERVISOR
β 474 POSTS
πΉASSISTANT ENGINEER
β 71 POSTS
πΉASSISTANT CITY ENGINEER
β 27 POSTS
β¨BATCH HIGHLIGHTS:
π LIVE + RECORDED LECTURES
π QUESTION PRACTICE BOOK FOR ATS/AE/ACE
πTEST SERIES AS PER SYLLABUS AND EXAM PATTERN
βΆοΈFEES - 4999/-
ππ»Join Batch Nowππ»
https://websankulcivilengineering.akamai.net.in/new-courses/83
π±Contact Us
72018 66333
β€2
β
DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEERπ·π»-824 POSTS-(ADVT NO. :-303/202526)
The property of a material which enables it to be rolled into thin sheets is
Anonymous Quiz
9%
Ductility
12%
Elasticity
75%
Malleability
4%
Toughness
The slope of the stressβstrain curve within the elastic limit represents
Anonymous Quiz
26%
Modulus of rigidity
11%
Bulk modulus
10%
Proof stress
53%
Youngβs modulus
The fineness of cement mainly affects
Anonymous Quiz
7%
Soundness
7%
Setting time
2%
Colour of cement
84%
Rate of hydration and strength
π2
The instrument used to measure horizontal angles with high precision is
Anonymous Quiz
82%
Theodolite
4%
Chain
7%
Plane table
7%
Dumpy level
In PERT analysis, the time estimate which has the highest probability of occurrence is
Anonymous Quiz
44%
Most likely time
15%
Expected time
27%
Optimistic time
14%
Pessimistic time
The load per unit area at which a material fails is known as
Anonymous Quiz
17%
Working stress
9%
Proof stress
63%
Ultimate stress
11%
Allowable stress
The test used to determine the consistency of cement paste is
Anonymous Quiz
84%
Vicat consistency test
7%
Setting time test
5%
Soundness test
4%
Slump test
β€1
The field test commonly used to determine the relative density of cohesionless soils is
Anonymous Quiz
24%
Standard Proctor test
26%
Core cutter method
27%
Standard Penetration Test
24%
Unconfined compression test
β€3
The portion of a door fixed to the wall opening is called
Anonymous Quiz
12%
Shutter
58%
Frame
9%
Panel
22%
Holdfast
The prime coat in flexible pavement is applied on
Anonymous Quiz
33%
Surface course
31%
Base course
10%
Subgrade
25%
Wearing course
β€1
The reduced level of a point below the datum is considered
Anonymous Quiz
7%
Positive
34%
Zero
11%
Constant
49%
Negative
The plasticity index of soil is equal to
Anonymous Quiz
13%
LL + PL
72%
LL β PL
12%
PL β SL
4%
LL β SL
The process of improving soil properties by adding lime or cement is called
Anonymous Quiz
4%
Compaction
19%
Consolidation
68%
Stabilization
8%
Grouting
β€2
The measurement of RCC work is generally carried out in
Anonymous Quiz
9%
Square metre
9%
Running metre
80%
Cubic metre
2%
Kilogram
The degree of saturation of soil is defined as the ratio of
Anonymous Quiz
6%
Volume of solids to total volume
21%
Volume of voids to volume of solids
57%
Volume of water to volume of voids
17%
Weight of water to weight of solids
β€1
The main purpose of curing concrete is to
Anonymous Quiz
91%
Maintain adequate moisture for hydration
3%
Improve surface appearance
4%
Reduce aggregate segregation
2%
Increase setting time
The main function of admixtures in concrete is to
Anonymous Quiz
2%
Increase cement content
93%
Modify properties of fresh or hardened concrete
0%
Reduce aggregate size
5%
Increase waterβcement ratio