The camber provided on a road surface is measured as
Anonymous Quiz
59%
Vertical rise to horizontal width
13%
Horizontal distance to width
9%
Ratio of span to depth
18%
Percentage of slope only
❤3
In building estimation, plinth area rate is used to
Anonymous Quiz
8%
Determine the cost of finishing works only
31%
Calculate the quantity of materials required
11%
Measure the area of walls
49%
Estimate the cost of the entire building
❤1
Soil having good drainage and low cohesion is generally
Anonymous Quiz
16%
Clay
19%
Silt
10%
Peat
55%
Sand
Damp proof course is usually provided at
Anonymous Quiz
69%
Plinth level
24%
Foundation base
2%
Window sill
4%
Roof level
Contour interval depends mainly on
Anonymous Quiz
34%
Scale of map
44%
Catchment of area
8%
Type of instrument
14%
Size of area only
🎉1
The common defect in concrete due to insufficient compaction is
Anonymous Quiz
5%
Bleeding
25%
Segregation
8%
Shrinkage
62%
Honeycombing
Live loads in a building do not include
Anonymous Quiz
11%
Weight of people
14%
Furniture
24%
Movable partitions
51%
Roof slab
🏆2
🔥Success મંત્ર Test Series for
🔥GPSSB - AAE - 350 POSTS
👉🏻ADVT. NO. 19/2025-26
✅3 Full length mock tests as per New Syllabus and Exam Pattern
👉🏻1st Test ✅ Uploaded
👉🏻2nd Test ✅Uploaded
👉🏻3rd Test ✅️Uploaded
✅Prepared by Subject Experts
✅GPSSB ની Pattern પ્રમાણે Technical + General Studies Subjects ના Questions Mix કરીને મુકવામાં આવ્યા છે .
✅Test Series નો એકપણ Question અમારી કોઈ Book માંથી લેવામાં આવેલ નથી.
✅બધા Questions Experts દ્વારા Latest Exam Pattern પ્રમાણે તૈયાર કરવામાં આવ્યાં છે.
📍Join Test Series Now
https://websankulcivilengineering.akamai.net.in/test-series/31
📱Contact Us
72018 66333
🔥GPSSB - AAE - 350 POSTS
👉🏻ADVT. NO. 19/2025-26
✅3 Full length mock tests as per New Syllabus and Exam Pattern
👉🏻1st Test ✅ Uploaded
👉🏻2nd Test ✅Uploaded
👉🏻3rd Test ✅️Uploaded
✅Prepared by Subject Experts
✅GPSSB ની Pattern પ્રમાણે Technical + General Studies Subjects ના Questions Mix કરીને મુકવામાં આવ્યા છે .
✅Test Series નો એકપણ Question અમારી કોઈ Book માંથી લેવામાં આવેલ નથી.
✅બધા Questions Experts દ્વારા Latest Exam Pattern પ્રમાણે તૈયાર કરવામાં આવ્યાં છે.
📍Join Test Series Now
https://websankulcivilengineering.akamai.net.in/test-series/31
📱Contact Us
72018 66333
❤1
🔥SPECIAL BATCH FOR
👷♂️AMC
👉🏻CODES /ACTS/ RULES & NEW TOPICS
For
➡️DEPUTY ESTATE OFFICER/ ASSISTANT T.D.O.
07 POSTS
➡️ESTATE INSPECTOR
23 POSTS
➡️ESTATE SAHAYAK SUB INSPECTOR
48 POSTS
✨Batch Highlights:
✅ Live Lectures Of CODES , ACTS, RULES & NEW TOPICS CONDUCTED BY HIGHLY EXPERIENCED FACULTIES
✅ RECORDING OF LIVE LECTURES ALSO PROVIDED
✅ TEST SERIES AS PER SYLLABUS AND EXAM PATTERN
🆓AMC ESTATE DEPARTMENT EXAMS THEORY AND QUESTION PRACTICE BOOKS AT YOUR DOORSTEP
To Purchase this Batch 👇🏻
📱CONTACT US
72018 66333
👷♂️AMC
👉🏻CODES /ACTS/ RULES & NEW TOPICS
For
➡️DEPUTY ESTATE OFFICER/ ASSISTANT T.D.O.
07 POSTS
➡️ESTATE INSPECTOR
23 POSTS
➡️ESTATE SAHAYAK SUB INSPECTOR
48 POSTS
✨Batch Highlights:
✅ Live Lectures Of CODES , ACTS, RULES & NEW TOPICS CONDUCTED BY HIGHLY EXPERIENCED FACULTIES
✅ RECORDING OF LIVE LECTURES ALSO PROVIDED
✅ TEST SERIES AS PER SYLLABUS AND EXAM PATTERN
🆓AMC ESTATE DEPARTMENT EXAMS THEORY AND QUESTION PRACTICE BOOKS AT YOUR DOORSTEP
To Purchase this Batch 👇🏻
📱CONTACT US
72018 66333
❤3
🛑 છેલ્લા 4 દિવસ બાકી
🏹એક તીર 6 🎯નિશાન
✅Special Batch for
🔥AMC EXAMS
✨Fees :
👉🏻9999/- ❌ 15% Off
👉🏻8499/- ✅
🗓️Valid till 31st January 2026
❌આના પછી offer Extende નહીં થાય,
👉🏻પછી કહેતાં નહીં કે અમે રહી ગયા.
📍Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/82
📱Contact Us :
72018 66333
🏹એક તીર 6 🎯નિશાન
✅Special Batch for
🔥AMC EXAMS
✨Fees :
👉🏻9999/- ❌ 15% Off
👉🏻8499/- ✅
🗓️Valid till 31st January 2026
❌આના પછી offer Extende નહીં થાય,
👉🏻પછી કહેતાં નહીં કે અમે રહી ગયા.
📍Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/82
📱Contact Us :
72018 66333
✅DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEER👷🏻-824 POSTS-(ADVT NO. :-303/202526)
A steel bar is rigidly fixed at both ends and subjected to a rise in temperature. The stress developed in the bar is known as
Anonymous Quiz
22%
Tensile stress
62%
Compressive stress
9%
Shear stress
7%
Bending stress
The type of support which resists vertical reaction but allows horizontal movement is
Anonymous Quiz
6%
Fixed support
28%
Hinged support
61%
Roller support
5%
Simple support
👏1
The raw material mainly responsible for early strength of cement is
Anonymous Quiz
35%
Lime
25%
Silica
35%
Alumina
5%
Iron oxide
🏆1
In chain surveying, tie lines are provided mainly to
Anonymous Quiz
77%
Increase accuracy of main framework
13%
Measure offsets
6%
Check bearing
4%
Reduce chain length
👌1
The total float of an activity is the difference between
Anonymous Quiz
42%
Earliest start and earliest finish
33%
Latest start and earliest start
20%
Earliest finish and latest finish
4%
Earliest finish and latest finish
A material which fails suddenly without much deformation is termed as
Anonymous Quiz
11%
Ductile
7%
Elastic
80%
Brittle
2%
Plastic
In a one-way RCC slab, the main reinforcement is provided
Anonymous Quiz
44%
Along the shorter span
29%
Along the longer span
24%
Along both spans equally
3%
Only at the supports
A soil sample has liquid limit = 45% and plastic limit = 25%.The plasticity index of the soil is
Anonymous Quiz
10%
15%
75%
20%
12%
25%
4%
30%
❤2
In levelling, the back sight reading is 1.850 m and the fore sight reading is 0.965 m.The rise between the two points is
Anonymous Quiz
19%
0.785 m
16%
1.785 m
18%
2.815 m
47%
0.885 m