๐ฅCIVIL ENGINEERING
๐ทโโ๏ธCLASS-3
๐QUESTION PRACTICE BOOK
๐๐ปPrice :
1499/- โ 60% OFF
599/- โ
๐Buy Book From Here
https://websankulcivilengineering.akamai.net.in/books/5
๐ฑCONTACT US
72018 66333
๐ทโโ๏ธCLASS-3
๐QUESTION PRACTICE BOOK
๐๐ปPrice :
1499/- โ 60% OFF
599/- โ
๐Buy Book From Here
https://websankulcivilengineering.akamai.net.in/books/5
๐ฑCONTACT US
72018 66333
โค2
๐ เชเซเชฒเซเชฒเชพ 5 เชฆเชฟเชตเชธ เชฌเชพเชเซ
๐นเชเช เชคเซเชฐ 6 ๐ฏเชจเชฟเชถเชพเชจ
โ Special Batch for
๐ฅAMC EXAMS
โจFees :
๐๐ป9999/- โ 15% Off
๐๐ป8499/- โ
๐๏ธValid till 31st January 2026
โเชเชจเชพ เชชเชเซ offer Extende เชจเชนเซเช เชฅเชพเชฏ,
๐๐ปเชชเชเซ เชเชนเซเชคเชพเช เชจเชนเซเช เชเซ เช เชฎเซ เชฐเชนเซ เชเชฏเชพ.
๐Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/82
๐ฑContact Us :
72018 66333
๐นเชเช เชคเซเชฐ 6 ๐ฏเชจเชฟเชถเชพเชจ
โ Special Batch for
๐ฅAMC EXAMS
โจFees :
๐๐ป9999/- โ 15% Off
๐๐ป8499/- โ
๐๏ธValid till 31st January 2026
โเชเชจเชพ เชชเชเซ offer Extende เชจเชนเซเช เชฅเชพเชฏ,
๐๐ปเชชเชเซ เชเชนเซเชคเชพเช เชจเชนเซเช เชเซ เช เชฎเซ เชฐเชนเซ เชเชฏเชพ.
๐Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/82
๐ฑContact Us :
72018 66333
โค4
โ
DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEER๐ท๐ป-824 POSTS-(ADVT NO. :-303/202526)
If the length of a prismatic bar is reduced to half, keeping load and cross-section same, the stress developed will
Anonymous Quiz
15%
Remain same
52%
Become four times
20%
Become half
14%
Become double
โค2
In a simply supported beam, the reaction at the roller support is
Anonymous Quiz
11%
Horizontal only
41%
Vertical only
7%
Moment only
41%
Both vertical and horizontal
The main product obtained after burning raw mix in cement manufacture is
Anonymous Quiz
59%
Clinker
15%
Lime
12%
Slag
15%
Gypsum
The fore bearing of a line in compass surveying is the angle measured:
Anonymous Quiz
73%
Between the line and the meridian in the forward direction
9%
Between the line and the horizontal plane
3%
Between consecutive survey stations
15%
From the end of the line back to the starting point
โค1
In project management, an Arrow Diagram represents:
Anonymous Quiz
31%
Activities as nodes and events as arrows
3%
Only critical activities
3%
Only parallel activities
63%
Activities as arrows and events as nodes
The ability of a material to absorb energy before fracture is called
Anonymous Quiz
18%
Elasticity
27%
Ductility
49%
Toughness
7%
Plasticity
โค1
The minimum percentage of main reinforcement in RCC slab is governed mainly to
Anonymous Quiz
4%
Increase strength
11%
Control cracking
4%
Reduce dead load
81%
Improve load carrying capacity of the slab
โค1
The angle of internal friction of a soil primarily depends on
Anonymous Quiz
2%
Water content of the soil
91%
Cohesion and particle interlocking
4%
Dry density of soil only
2%
Specific gravity of soil
โค1
In levelling, differential levelling is mainly used to:
Anonymous Quiz
11%
Measure horizontal distances
46%
Locate points in plane table surveying
4%
Reduce chaining errors
39%
Determine the gradient of a road
In water supply design, a rising main is used to:
Anonymous Quiz
7%
Drain excess water from the reservoir
6%
Store water at high elevation
86%
Convey water under pressure from the pump to the reservoir
2%
Measure the flow rate in the system
For a steel rod under axial tension, the maximum elongation occurs at the section where
Anonymous Quiz
40%
Cross-sectional area is maximum
4%
Material is thickest
6%
Stress is zero
50%
Cross-sectional area is minimum
๐1๐1
Reciprocal levelling is mainly used to
Anonymous Quiz
1%
Increase speed
2%
Reduce computation
94%
Eliminate curvature and refraction errors
2%
Determine contours
โค1
The test used to check presence of organic impurities in sand is
Anonymous Quiz
26%
Sieve analysis
32%
Bulking test
13%
Crushing test
30%
Colour test
๐10โค2
The camber provided on a road surface is measured as
Anonymous Quiz
59%
Vertical rise to horizontal width
13%
Horizontal distance to width
9%
Ratio of span to depth
18%
Percentage of slope only
โค3
In building estimation, plinth area rate is used to
Anonymous Quiz
8%
Determine the cost of finishing works only
31%
Calculate the quantity of materials required
11%
Measure the area of walls
49%
Estimate the cost of the entire building
โค1
Soil having good drainage and low cohesion is generally
Anonymous Quiz
16%
Clay
19%
Silt
10%
Peat
55%
Sand
Damp proof course is usually provided at
Anonymous Quiz
69%
Plinth level
24%
Foundation base
2%
Window sill
4%
Roof level