In water supply systems, service reservoirs are mainly provided to
Anonymous Quiz
9%
Pump water
45%
Measure discharge
7%
Treat water
39%
Store water
In RCC slabs, distribution reinforcement is provided mainly to
Anonymous Quiz
16%
Resist bending moment
2%
Carry dead load
81%
Control shrinkage and temperature cracks
1%
Increase slab thickness
The process of measuring reduced levels of ground along a fixed alignment is known as
Anonymous Quiz
13%
Fly levelling
40%
Profile levelling
33%
Reciprocal levelling
14%
Differential levelling
❤2
In levelling work, the line of collimation of a level instrument is
Anonymous Quiz
4%
The line joining the centres of two stations
3%
The vertical line through the instrument
90%
The horizontal line passing through the optical centre of telescope
3%
The line joining benchmark and staff station
❤1
The wearing course of a flexible pavement is also known as
Anonymous Quiz
5%
Subgrade
14%
Base course
16%
Binder course
64%
Surface course
In rate analysis, the provision made for tools, plant, water charges and supervision is included under
Anonymous Quiz
8%
Material cost
5%
Labour cost
17%
Contractor’s profit
70%
Overhead charges
A soil having high compressibility and low shear strength is generally
Anonymous Quiz
9%
Gravel
17%
Sand
25%
Laterite
50%
Clay
❤1
The purpose of providing a damp proof course in buildings is to prevent
Anonymous Quiz
3%
Heat transfer
22%
Sound transmission
8%
Settlement
67%
Rising dampness
In levelling, a benchmark whose RL is assumed is called
Anonymous Quiz
24%
Permanent BM
39%
Temporary BM
30%
Arbitrary BM
7%
GTS BM
The most common cause of segregation in concrete is
Anonymous Quiz
9%
Proper grading
65%
Excessive vibration
21%
Low water content
5%
Fine aggregates
Which of the following loads is considered only during the design stage and not during normal service conditions of a building?
Anonymous Quiz
10%
Live load
20%
Dead load
14%
Wind load
56%
Construction load
🛑 છેલ્લા 6 દિવસ બાકી
🏹એક તીર 6 🎯નિશાન
✅Special Batch for
🔥AMC EXAMS
✨Fees :
👉🏻9999/- ❌ 15% Off
👉🏻8499/- ✅
🗓️Valid till 31st January 2026
❌આના પછી offer Extende નહીં થાય,
👉🏻પછી કહેતાં નહીં કે અમે રહી ગયા.
📍Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/82
📱Contact Us :
72018 66333
🏹એક તીર 6 🎯નિશાન
✅Special Batch for
🔥AMC EXAMS
✨Fees :
👉🏻9999/- ❌ 15% Off
👉🏻8499/- ✅
🗓️Valid till 31st January 2026
❌આના પછી offer Extende નહીં થાય,
👉🏻પછી કહેતાં નહીં કે અમે રહી ગયા.
📍Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/82
📱Contact Us :
72018 66333
🔥CIVIL ENGINEERING
👷♂️CLASS-3
📘QUESTION PRACTICE BOOK
👉🏻Price :
1499/- ❌ 60% OFF
599/- ✅
📍Buy Book From Here
https://websankulcivilengineering.akamai.net.in/books/5
📱CONTACT US
72018 66333
👷♂️CLASS-3
📘QUESTION PRACTICE BOOK
👉🏻Price :
1499/- ❌ 60% OFF
599/- ✅
📍Buy Book From Here
https://websankulcivilengineering.akamai.net.in/books/5
📱CONTACT US
72018 66333
❤2
🛑 છેલ્લા 5 દિવસ બાકી
🏹એક તીર 6 🎯નિશાન
✅Special Batch for
🔥AMC EXAMS
✨Fees :
👉🏻9999/- ❌ 15% Off
👉🏻8499/- ✅
🗓️Valid till 31st January 2026
❌આના પછી offer Extende નહીં થાય,
👉🏻પછી કહેતાં નહીં કે અમે રહી ગયા.
📍Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/82
📱Contact Us :
72018 66333
🏹એક તીર 6 🎯નિશાન
✅Special Batch for
🔥AMC EXAMS
✨Fees :
👉🏻9999/- ❌ 15% Off
👉🏻8499/- ✅
🗓️Valid till 31st January 2026
❌આના પછી offer Extende નહીં થાય,
👉🏻પછી કહેતાં નહીં કે અમે રહી ગયા.
📍Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/82
📱Contact Us :
72018 66333
❤4
✅DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEER👷🏻-824 POSTS-(ADVT NO. :-303/202526)
If the length of a prismatic bar is reduced to half, keeping load and cross-section same, the stress developed will
Anonymous Quiz
15%
Remain same
52%
Become four times
20%
Become half
14%
Become double
❤2
In a simply supported beam, the reaction at the roller support is
Anonymous Quiz
11%
Horizontal only
41%
Vertical only
7%
Moment only
41%
Both vertical and horizontal
The main product obtained after burning raw mix in cement manufacture is
Anonymous Quiz
59%
Clinker
15%
Lime
12%
Slag
15%
Gypsum
The fore bearing of a line in compass surveying is the angle measured:
Anonymous Quiz
73%
Between the line and the meridian in the forward direction
9%
Between the line and the horizontal plane
3%
Between consecutive survey stations
15%
From the end of the line back to the starting point
❤1
In project management, an Arrow Diagram represents:
Anonymous Quiz
31%
Activities as nodes and events as arrows
3%
Only critical activities
3%
Only parallel activities
63%
Activities as arrows and events as nodes