DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEERπ·π»-824 POSTS-(ADVT NO. :-303/202526)
In CPM, the earliest occurrence time of an event is governed by
Anonymous Quiz
12%
The longest incoming path
18%
The shortest incoming activity
54%
Average duration of incoming activities
15%
Slack of predecessor events
π1
Heave in soils is most likely to occur when
Anonymous Quiz
5%
Soil is dry
8%
Capillary rise is absent
8%
Downward seepage exists
79%
Upward seepage reduces effective stress to zero
π1
In a triangulation network, a well-conditioned triangle has angles approximately equal to
Anonymous Quiz
26%
30Β°, 60Β°, 90Β°
18%
45Β°, 45Β°, 90Β°
31%
60Β°, 60Β°, 60Β°
25%
30Β°, 30Β°, 120Β°
β€1
The differential equation of the elastic curve of a beam is derived from
Anonymous Quiz
9%
Shear force equilibrium
16%
Moment equilibrium
19%
Flexural stress equation
56%
Loadβdeflection relationship
The primary reason for using fly ash in concrete is to
Anonymous Quiz
3%
Increase early strength
6%
Reduce cement fineness
85%
Improve long-term strength and durability
5%
Accelerate setting
The compound mainly responsible for flash setting of cement is
Anonymous Quiz
60%
CβA
19%
CβAF
9%
CβS
13%
CβS
In CPM, free float of an activity depends on
Anonymous Quiz
70%
Successor event earliest time
8%
Project duration
11%
Total number of activities
10%
Predecessor event times
In an unconfined aquifer, transmissivity varies primarily with
Anonymous Quiz
13%
Porosity
39%
Hydraulic gradient
34%
Saturated thickness
14%
Specific yield
When contour lines cross a stream, they form a
Anonymous Quiz
24%
Ridge
42%
Valley
21%
Plateau
14%
Saddle
In statically indeterminate structures, secondary stresses arise due to
Anonymous Quiz
25%
External loading
24%
Self-weight
25%
Section modulus
25%
Support settlement
The most effective method to control plastic shrinkage cracking is
Anonymous Quiz
54%
Reducing rate of evaporation
22%
Using higher grade concrete
13%
Increasing cement content
10%
Delaying finishing operations
An activity with maximum independent float implies
Anonymous Quiz
40%
Predecessor and successor are both critical
48%
Neither predecessor nor successor is critical
10%
Activity lies on critical path
2%
Project duration is fixed
The activated sludge process efficiency mainly depends on
Anonymous Quiz
6%
Detention time only
22%
Sludge volume index
69%
Food-to-microorganism ratio
3%
Influent temperature
The most accurate method for determining elevation difference across a river is
Anonymous Quiz
16%
Trigonometric leveling
13%
Barometric leveling
15%
Fly leveling
57%
Reciprocal leveling
In flexibility method, compatibility equations are written in terms of
Anonymous Quiz
9%
Internal forces
12%
Reactions
61%
Joint displacements
18%
Redundant forces
β€2
Resistance to carbonation of concrete improves with
Anonymous Quiz
60%
Higher waterβcement ratio
24%
Better curing
6%
Higher porosity
11%
Increased permeability
Total float becomes negative when
Anonymous Quiz
81%
Target completion time is less than critical path duration
11%
Network has multiple critical paths
4%
Project finishes early
4%
Activity is dummy
Pre-chlorination in water treatment is mainly used for
Anonymous Quiz
13%
Removal of hardness
76%
Control of algae and taste-odor
8%
Reduction of turbidity
4%
Removal of nitrates
β€1
The angular error of closure in a closed traverse of n sides is proportional to
Anonymous Quiz
14%
nΒ²
51%
βn
8%
n
26%
1/n