The soil with maximum angle of internal friction is
Anonymous Quiz
44%
Clay
13%
Silt
39%
Sand
4%
Peat
The pollutant responsible for eye irritation in smog is
Anonymous Quiz
16%
Ozone
50%
Carbon dioxide
19%
Lead
16%
Methane
❤2
The estimate that replaces an earlier sanctioned estimate is
Anonymous Quiz
38%
Supplementary
56%
Revised
3%
Annual
2%
Repair
❤2
Seismic response reduction factor accounts for
Anonymous Quiz
14%
Elastic behavior
74%
Inelastic energy dissipation
4%
Dead load only
8%
Soil bearing capacity
Transition length on a highway depends on
Anonymous Quiz
3%
Camber only
93%
Speed and super elevation
3%
Pavement thickness
1%
Shoulder width
The vertical distance between datum and ground is
Anonymous Quiz
50%
Reduced level
44%
Height of instrument
5%
Staff reading
1%
Chainage
The concept of carrying capacity is used in
Anonymous Quiz
52%
Structural design
38%
Environmental planning
7%
Rate analysis
3%
Survey adjustment
Cost overrun mainly affects
Anonymous Quiz
26%
Direct cost only
45%
Indirect cost only
25%
Project viability
3%
Soil investigation
❤2
Theodolite least count is obtained by
Anonymous Quiz
42%
Main scale / vernier divisions
50%
Vernier divisions / main scale
4%
Circle diameter
5%
Telescope magnification
The water content at which soil changes from plastic to semi-solid state is
Anonymous Quiz
8%
Liquid limit
50%
Plastic limit
41%
Shrinkage limit
1%
Flow limit
❤1
The main aim of environmental management plan is
Anonymous Quiz
5%
Construction speed
88%
Pollution mitigation
5%
Land acquisition
1%
Cost reduction
🏆1
Escalation in project cost is due to
Anonymous Quiz
43%
Inflation
20%
Survey error
34%
Overdesign
3%
Compaction
❤3
Base shear is distributed along height based on
Anonymous Quiz
60%
Mass and stiffness
14%
Slab thickness
13%
Column spacing
12%
Foundation type
❤2
Overtaking sight distance is required on
Anonymous Quiz
9%
Curves only
39%
Two-lane roads
50%
Multi-lane highways
2%
Service roads
Settlement analysis is critical for
Anonymous Quiz
14%
Light structures
57%
Raft foundations
17%
Temporary sheds
12%
Steel trusses
❤2
The precautionary principle applies to
Anonymous Quiz
6%
Known impacts only
84%
Uncertain environmental risks
9%
Structural failures
2%
Economic losses
❤2
Critical activity has
Anonymous Quiz
17%
Maximum float
19%
Minimum duration
62%
Zero total float
2%
Maximum cost
❤1
ViewFile (5).pdf
1.8 MB
🧾 જાહેરાત નં. 331/2025-26 –
પ્લાનિંગ આસિસ્ટન્ટ (વર્ગ–3)
🖥️ MCQ–CBRT આધારિત પરીક્ષા | કોલ લેટર તારીખ 16-12-2025 સાંજે 5 વાગ્યા થી ડાઉનલોડ કરવાના શરૂ થશે.
♿ દિવ્યાંગ ઉમેદવારો માટે લેખિત/વલતર સમય અંગે ખાસ સૂચના
📌 ઉમેદવારોને તમામ સૂચનાઓ ધ્યાનપૂર્વક વાંચવાની વિનંતી
📲 સમયસર કોલ લેટર ડાઉનલોડ કરો
🎯 આત્મવિશ્વાસ સાથે પરીક્ષામાં હાજર રહો
Join Our Telegram Group
https://t.me/civilsolutionhubby_harshilsir
પ્લાનિંગ આસિસ્ટન્ટ (વર્ગ–3)
🖥️ MCQ–CBRT આધારિત પરીક્ષા | કોલ લેટર તારીખ 16-12-2025 સાંજે 5 વાગ્યા થી ડાઉનલોડ કરવાના શરૂ થશે.
♿ દિવ્યાંગ ઉમેદવારો માટે લેખિત/વલતર સમય અંગે ખાસ સૂચના
📌 ઉમેદવારોને તમામ સૂચનાઓ ધ્યાનપૂર્વક વાંચવાની વિનંતી
📲 સમયસર કોલ લેટર ડાઉનલોડ કરો
🎯 આત્મવિશ્વાસ સાથે પરીક્ષામાં હાજર રહો
Join Our Telegram Group
https://t.me/civilsolutionhubby_harshilsir
❤4👍2🏆1