A preliminary estimate is based on
Anonymous Quiz
52%
Plinth area
15%
Detailed BOQ
18%
Measurement book
15%
Technical sanction
The base shear is proportional to
Anonymous Quiz
14%
Building height
49%
Weight of structure
28%
Number of floors only
9%
Wind speed
The gradient of a road is expressed as
Anonymous Quiz
15%
Ratio
48%
Percentage
25%
Degrees
12%
Radians
๐1
A staff reading greater than backsight indicates
Anonymous Quiz
33%
Rise
47%
Fall
16%
Benchmark
4%
Turning point
๐ฏ2
๐ Municipal Engineer เชจเซ Exam Date (11/12/2025) เชเชตเซ เชเช เชเซ.
๐ฅBooster Course for
MUNICIPAL ENGINEER
๐๐ป60 POSTS
Advt. no. 350/2025-26
Only @799/-
๐Join Course Now
https://websankulcivilengineering.akamai.net.in/test-series/27
๐ฑContact Us
72018 66333
๐ฅBooster Course for
MUNICIPAL ENGINEER
๐๐ป60 POSTS
Advt. no. 350/2025-26
Only @799/-
๐Join Course Now
https://websankulcivilengineering.akamai.net.in/test-series/27
๐ฑContact Us
72018 66333
โค4
The term โover consolidationโ refers to soils
Anonymous Quiz
2%
Never loaded
84%
That experienced higher past pressure
9%
With low void ratio
4%
Saturated always
EIA requires which of the following?
Anonymous Quiz
2%
Land survey
92%
Environmental monitoring plan
2%
RCC detailing
3%
Highway alignment
In project crashing, the cost associated with reducing the duration is
Anonymous Quiz
16%
Normal cost
64%
Crash cost
15%
Indirect cost
4%
Recurring cost
โค1
โ
DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEER๐ท๐ป-824 POSTS-(ADVT NO. :-303/202526)
The compressive strength of cement mortar is tested using
Anonymous Quiz
68%
Cube mould 70.6 mm
25%
UTM cylinder mould
4%
Core cutter
3%
Blaine apparatus
๐1
The dual role of a milestone is
Anonymous Quiz
11%
Time & cost
21%
Monitoring & control
66%
Indicator of start/end of phases
3%
Resource decision point
The detention time in a sedimentation tank is typically
Anonymous Quiz
34%
30 minutes
38%
2 hours
20%
12 hours
8%
1 day
โค2๐1
When a station is inaccessible, horizontal distance is measured using
Anonymous Quiz
42%
EDM
47%
Tacheometry
7%
Chaining
4%
Leveling
For a fixed beam, the slope at free end is
Anonymous Quiz
47%
Zero
36%
Maximum
6%
Constant
10%
Depends on EI
The main purpose of adding gypsum in cement is to
Anonymous Quiz
12%
Increase strength
58%
Reduce setting time
29%
Control flash setting
1%
Improve fineness
โค2
Event slack is equal to
Anonymous Quiz
7%
LS โ ES
10%
LF โ EF
82%
Both (a) and (b)
2%
Duration ร Float
The typical DO level in natural streams is
Anonymous Quiz
10%
0 mg/L
63%
3โ5 mg/L
21%
7โ9 mg/L
7%
15 mg/L
The vertical axis of the theodolite holds the
Anonymous Quiz
30%
Telescope
52%
Horizontal plate
12%
Level tube
6%
Verniers
โค1
The strain in a bar subjected to temperature change is
Anonymous Quiz
26%
ฮฑฮT
38%
EฮฑฮT
20%
ฮL/L
17%
PL/AE
๐ PLANNING ASSISTANT เชจเซ Exam Date (14/12/2025) เชเชตเซ เชเช เชเซ.
โจSuccess เชฎเชเชคเซเชฐ Test Series for
๐ฅPLANNING ASSISTANT
๐๐ป8 Technical Subjects Subject Wise (50 marks) Tests
๐๐ป3 full length mock test series
๐นPrepared by Harshil sir, feni mam and Team
๐นAs per New Exam Pattern and Syllabus
๐๐ปOnly @ 499/-
Test Series เชฎเชพเช เชเชชเซเชฒ Questions PYQ เชจเชฅเซ. โ
โ Test Series เชจเชพ Questions Harshil sir เช เชจเซ Feni Ma'am เชฆเซเชตเชพเชฐเชพ PYQ เชจเซ Analysis เชเชฐเซเชจเซ เชฌเชจเชพเชตเซเชฒเชพเช เชเซ.
๐Join Test Now
https://websankulcivilengineering.akamai.net.in/test-series/29
๐ฑContact Us
72018 66333
โจSuccess เชฎเชเชคเซเชฐ Test Series for
๐ฅPLANNING ASSISTANT
๐๐ป8 Technical Subjects Subject Wise (50 marks) Tests
๐๐ป3 full length mock test series
๐นPrepared by Harshil sir, feni mam and Team
๐นAs per New Exam Pattern and Syllabus
๐๐ปOnly @ 499/-
Test Series เชฎเชพเช เชเชชเซเชฒ Questions PYQ เชจเชฅเซ. โ
โ Test Series เชจเชพ Questions Harshil sir เช เชจเซ Feni Ma'am เชฆเซเชตเชพเชฐเชพ PYQ เชจเซ Analysis เชเชฐเซเชจเซ เชฌเชจเชพเชตเซเชฒเชพเช เชเซ.
๐Join Test Now
https://websankulcivilengineering.akamai.net.in/test-series/29
๐ฑContact Us
72018 66333