The VDF (Vehicle Damage Factor) is used in
Anonymous Quiz
11%
Camber design
76%
Pavement design
4%
Sewer design
8%
Bridge design
β€2
The most suitable cement for underwater construction is
Anonymous Quiz
2%
OPC
4%
PPC
39%
Rapid Hardening Cement
55%
Quick Setting Cement
In shear force diagrams, sudden jumps indicate
Anonymous Quiz
15%
Moments
29%
Axial load
14%
Shear
42%
Point loads
β€2
The chlorine that remains after reaction is
Anonymous Quiz
8%
Chlorine demand
10%
Applied chlorine
78%
Residual chlorine
4%
Combined chlorine
The factor of safety for slope stability in long-term analysis is
Anonymous Quiz
7%
1.0
28%
1.2
57%
1.5
8%
1.7
β€1
Transition curves reduce
Anonymous Quiz
14%
Superelevation
77%
Centrifugal acceleration
8%
Gradient
1%
Lane width
β
DAILY QUESTION PRACTICE QUIZ FOR GSSSB-PLANNING ASSISTANTπ·π»-100 POSTS-(ADVT NO. :331/202526)
In traversing, closing error is adjusted by
Anonymous Quiz
18%
Simpson rule
7%
Corelation rule
6%
Equal shift rule
69%
Bowditch rule
β€1
Book value of a property means
Anonymous Quiz
45%
Market value
28%
Depreciated value
6%
Replacement value
21%
Capitalized value
Base shear is calculated based on
Anonymous Quiz
5%
Wind speed
14%
Concrete grade
70%
Earthquake zone factor
10%
Live load
β€2
The design speed for urban arterial roads is usually
Anonymous Quiz
6%
20β25 km/h
51%
30β40 km/h
32%
50β60 km/h
11%
80β90 km/h
The magnetic needle always aligns towards
Anonymous Quiz
24%
True north
72%
Magnetic north
3%
Grid north
1%
Solar north
Soil-bearing capacity increases with
Anonymous Quiz
13%
High void ratio
7%
Low density
6%
Saturation
75%
Compaction
Timeβcost tradeoff in projects is known as
Anonymous Quiz
47%
Crashing
11%
Fast tracking
13%
Float analysis
29%
Resource smoothing
β
DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEERπ·π»-824 POSTS-(ADVT NO. :-303/202526)
Initial consistency of cement is measured using
Anonymous Quiz
5%
Blaine test
76%
Vicat apparatus
17%
Le Chatelier mould
2%
Impact hammer
A dummy activity consumes
Anonymous Quiz
4%
Time only
5%
Resources only
22%
Both time and resources
70%
Neither time nor resources