Please open Telegram to view this post
VIEW IN TELEGRAM
❤2👍2🏆1
The waste produced in cotton mills are
Anonymous Quiz
19%
(A) Municipal solid waste
28%
(B) Non-biodegradable waste
17%
(C) Hazardous waste
36%
(D) Non-hazardous waste
Which of the following IS -Code is used for the basic requirements for water supply, drainage and sanitation?
Anonymous Quiz
5%
(A) IS 456
28%
(B) IS 1035 (Part 32)
38%
(C) IS 10500 (2012)
30%
(D) IS 1172: 1993
👍1
The maximum permissible nitrites in public water supplies, is
Anonymous Quiz
50%
(A) Nil
21%
(B) 0.5 P.P.M.
18%
(C) 1.0. P.P.M.
10%
(D) 1.5 P.P.M.
❤4
While considering the design period, which must be given more priority?
Anonymous Quiz
8%
(A) Area of land
69%
(B) Population
15%
(C) Usage of water
8%
(D) Arrangement of pipes
👍3
In the concept of self purification of natural streams, complete the following phrase. Solution to pollution is _________
Anonymous Quiz
13%
(A) Control
62%
(B) Dilution
13%
(C) Reuse
13%
(D) Recycle
👍2
Please open Telegram to view this post
VIEW IN TELEGRAM
👌3👍1👏1
Please open Telegram to view this post
VIEW IN TELEGRAM
🎉1
🔗
Authentic & Exclusive Free Study Materials
Please open Telegram to view this post
VIEW IN TELEGRAM
🏆6🫡5❤3👍2
The most appropriate term used for the amount which is issued to a subordinate officer so that he could make petty payments of specified nature while executing works under his charge is:
Anonymous Quiz
10%
(a) Cash
34%
(b) Advance
43%
(c) Imprest
14%
(d) Credit
Which one of the following is not an excavating and moving type of equipment?
Anonymous Quiz
7%
(a) Bulldozer
24%
(b) Clam shell
23%
(c) Scraper
46%
(d) Dump truck
👍1
Which of the following depends on Build Operate Transfer System of Contract?
Anonymous Quiz
4%
(a) Fixed price
21%
(b) Resource and service
65%
(c) Public private partnership
10%
(d) Cost plus fee
The following document contains detailed descriptions of all items of work excluding their quantities along with the current rates:
Anonymous Quiz
11%
(a) Analysis of rates
24%
(b) Tender document
24%
(c) Abstract estimate
41%
(d) Schedule of rate
Estimate for electrical wiring is prepared on the basis of
Anonymous Quiz
8%
(a) Voltage
8%
(b) Power
23%
(c) Number of appliaces
61%
(d) Number of points
👍3
Please open Telegram to view this post
VIEW IN TELEGRAM
❤4👍3
Please open Telegram to view this post
VIEW IN TELEGRAM
Please open Telegram to view this post
VIEW IN TELEGRAM
❤3👌1
Which of these are the external sources of dampness?
Anonymous Quiz
34%
(A) Precipitation
18%
(B) Condensation
23%
(C) Leaking services
26%
(D) Construction moisture
👍4
Which of the following is the normal defect that is looked during the visual inspection?
Anonymous Quiz
23%
(A) Corrosion of rebars
14%
(B) Cover details
51%
(C) Honeycomb
12%
(D) Joints formation
👍5👏1🎉1