Which of the following is the chronological sequence in regard to road construction design?
Anonymous Quiz
22%
(A) Telford, Tresaguet, CBR, Macadam
50%
(B) Tresaguet, Telford, Macadam, CBR
18%
(C) Macadam, CBR, Tresaguet, telford
10%
(D) Tresaguet, Macadam, CBR, Telford
👍5🥰3
The road portion used by the vehicular traffic is known as
Anonymous Quiz
4%
(A) Foot path
6%
(B) motor way
31%
(C) right of way
59%
(D) carriage way
❤3👍3🫡2
Please open Telegram to view this post
VIEW IN TELEGRAM
YouTube
Mock Interview | Dhruvrajsinh Gohel | Rank - 16 | Assistant Engineer (Irrigation Department)
📚 Topper Mock Interview By WebSankul Civil Engineering
👔 Name : Shri Dhruvrajsinh Balbhadrasinh Gohel
🎖️ Rank - 016 (Assistant Engineer - Irrigation Department)
✅ આશા રાખીએ છીએ કે આ મોક ઇન્ટરવ્યુ જોયા બાદ તમામ વિદ્યાર્થીઓ જે ભવિષ્યમાં પોતે પણ GPSC ક્લાસ…
👔 Name : Shri Dhruvrajsinh Balbhadrasinh Gohel
🎖️ Rank - 016 (Assistant Engineer - Irrigation Department)
✅ આશા રાખીએ છીએ કે આ મોક ઇન્ટરવ્યુ જોયા બાદ તમામ વિદ્યાર્થીઓ જે ભવિષ્યમાં પોતે પણ GPSC ક્લાસ…
❤4👍4
The bearing capacity of a water logged soil can be improved by
Anonymous Quiz
22%
(A) Compacting the soil
33%
(B) Draining the soil
32%
(C) Increasing the depth of foundation
13%
(D)Grouting
👍3
The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called
Anonymous Quiz
34%
(A) Brick on edge
19%
(B) Brick on end .
21%
(C) Brick on bed
25%
(D)Brick held vertically
❤1👍1
A floor constructed with the 4 to 6 mm marble chips, is known
Anonymous Quiz
10%
(A) Reinforced marble floor
67%
(B) Terrazzo floor
16%
(C)Marble floor
7%
(D)Chip floor
👍2
A stair should not have pitch more than
Anonymous Quiz
16%
(A) 25°
33%
(B) 30°
46%
(C) 40°
6%
(D) 50°
👍2
A wooden block hinged on post outside a door, is known
Anonymous Quiz
29%
(A) Cleat
21%
(B) Stop
47%
(C) Horn
3%
(D)None of these
👍1
Please open Telegram to view this post
VIEW IN TELEGRAM
YouTube
Mock Interview | Bipinkumar Chaudhary | Rank - 41 | Assistant Engineer (Irrigation Department)
📚 Topper Mock Interview By WebSankul Civil Engineering👔 Name : Shri Bipinkumar Kamrajbhai Chaudhary🎖️ Rank - 041 (Assistant Engineer - Irrigation Depart...
👍2🏆1
Floor area ratio and plot coverage will helps to determine
Anonymous Quiz
19%
(A) Actual cost of the Building
54%
(B) Approximate cost of the Building
24%
(C) Administrative approval cost
3%
(D) Security deposit amount
Detailed specifications includes:
Anonymous Quiz
24%
(A) Rates of various items of work
23%
(B) Measurements taken after execution of work
9%
(C) Quantities of items dumped at site
44%
(D) Quantities and qualities of materials
An item not included in the plinth area estimate is the:
Anonymous Quiz
20%
(A) Verandah
18%
(B) Water closet
14%
(C) Wall thickness
48%
(D) Court yard
In analysis of rates which is/are included from the following?
Anonymous Quiz
5%
(A) Cost of quantities of materials.
13%
(B) Cost of labour and other miscellaneous expenditures.
6%
(C) Contractor's profit
76%
(D) All of these
👍5
In order to compute the quantities of R.C.C beams, lengths of beams are measured to the
Anonymous Quiz
35%
(A) nearest millimeter
26%
(B) nearest half centimeter
28%
(C) nearest centimeter
11%
(D) nearest inch
👍2