A vehicle moving at 40 kmph stopped by applying brakes and the length of skid mark was 12.2 m. If the average skid resistance is 0.7 then break efficiency is:
Anonymous Quiz
15%
(a) 73.7
44%
(b) 68.9
34%
(c) 82.3
6%
(d) 37.4
👍2💯1
A plan of an area drawn with the original scale of Icm = 10m , the shrunk such that a line, originally 15 cm long on the plan, measures now 14.5 cm. The shrunk scale is given by 1 cm equal to:
Anonymous Quiz
28%
(a) 10.34 m
35%
(b) 10.97 m
24%
(c) 0.97 m
12%
(d) 9.70 m
👍2
https://www.instagram.com/reel/C3DPsU9x3rR/?igsh=MWY1NmNoN2gwYmNrYw==
🏆 તમારી Planning Assistantની તૈયારીના અંતિમ પ્રહાર માટે
🌟સર્જન બેચ🌟
🏆Special Batch For 3 Subjects
1.Preparation and study of Maps/Plans
2.Ecology and Environment
3. Seismic Engineering and Disaster Management
આજે જ સર્જન બેચમાં જોડાવા માટે,
Download Websankul Civil Engineering Live Application
https://oxzlwa.courses.store/457095?utm_source%3Dother%26utm_medium%3Dtutor-course-referral%26utm_campaign%3Dcourse-overview-webapp
📱વધુ માહિતી માટે સંપર્ક કરો
7201866333
🏆 તમારી Planning Assistantની તૈયારીના અંતિમ પ્રહાર માટે
🌟સર્જન બેચ🌟
🏆Special Batch For 3 Subjects
1.Preparation and study of Maps/Plans
2.Ecology and Environment
3. Seismic Engineering and Disaster Management
આજે જ સર્જન બેચમાં જોડાવા માટે,
Download Websankul Civil Engineering Live Application
https://oxzlwa.courses.store/457095?utm_source%3Dother%26utm_medium%3Dtutor-course-referral%26utm_campaign%3Dcourse-overview-webapp
📱વધુ માહિતી માટે સંપર્ક કરો
7201866333
👍1🔥1
This media is not supported in your browser
VIEW IN TELEGRAM
https://www.instagram.com/reel/C3DPsU9x3rR/?igsh=MWY1NmNoN2gwYmNrYw==
🏆 તમારી Planning Assistantની તૈયારીના અંતિમ પ્રહાર માટે
🌟સર્જન બેચ🌟
🏆Special Batch For 3 Subjects
1.Preparation and study of Maps/Plans
2.Ecology and Environment
3. Seismic Engineering and Disaster Management
આજે જ સર્જન બેચમાં જોડાવા માટે,
Download Websankul Civil Engineering Live Application
https://oxzlwa.courses.store/457095?utm_source%3Dother%26utm_medium%3Dtutor-course-referral%26utm_campaign%3Dcourse-overview-webapp
📱વધુ માહિતી માટે સંપર્ક કરો
7201866333
🏆 તમારી Planning Assistantની તૈયારીના અંતિમ પ્રહાર માટે
🌟સર્જન બેચ🌟
🏆Special Batch For 3 Subjects
1.Preparation and study of Maps/Plans
2.Ecology and Environment
3. Seismic Engineering and Disaster Management
આજે જ સર્જન બેચમાં જોડાવા માટે,
Download Websankul Civil Engineering Live Application
https://oxzlwa.courses.store/457095?utm_source%3Dother%26utm_medium%3Dtutor-course-referral%26utm_campaign%3Dcourse-overview-webapp
📱વધુ માહિતી માટે સંપર્ક કરો
7201866333
❤1🔥1
A term referring to the shortest possible time for which an activity can be schedule:
Anonymous Quiz
47%
(a) Crash duration
10%
(b) Expansion
37%
(c) Slack
7%
(d) Flexibility
If the optimistic time, most likely time and pessimistic time for activity A are 7, 8 and 9 days respectively and for activity B are 6, 7.5 and 12 days respectively, then :
Anonymous Quiz
23%
(a) Expected time of activity A is greater than the expected time of activity B
47%
(b) Expected time of both the activities A and B will be same
27%
(c) Expected time of activity B is greater than the expected time of activity A
3%
(d) None of the above
If " D " is the duration, 'ES' and 'EF' are the earliest start and finish times, 'LS' and LF' are latest start and latest finish times, the following relationship holds good.
Anonymous Quiz
22%
(a) D = LF - EF
25%
(b) LS = LF + D
23%
(c) LF = LS - ES
30%
(d) EF = ES + D
The optimistic time, pessimistic time and most likely time required for completion of activity is 4, 11 and 6 days respectively. The expected time is
Anonymous Quiz
6%
(a) 5 days
20%
(b) 6 days
30%
(c) 5.5 days
43%
(d) 6.5 days
👍1💯1
For a saturated soil, skempton's B-parameter is
Anonymous Quiz
22%
(a) nearly zero
32%
(b) nearly 0.5
41%
(c) nearly 1.0
5%
(d) very high
👍1🎉1
Bitumen stabilization is suitable for
Anonymous Quiz
29%
(a) Clayey soil
45%
(b) Sandy soil
17%
(c) Peaty soil
8%
(d) Silty soil
A wet cohesive soil is most effectively stabilized by the addition of :
Anonymous Quiz
49%
(a) Lime
19%
(b) Bitumen
22%
(c) Fly Ash
9%
(d) Cement
The amount which is paid at the time of submitting a tender is known as:
Anonymous Quiz
63%
(a) earnest money deposit
18%
(b) security deposit
7%
(c) license money deposit
12%
(d) earnest and security money deposits
Once a tender is accepted, a deposit of about 5 % of the total estimated cost of the work is called:
Anonymous Quiz
24%
(a) earnest money deposit
66%
(b) security deposit
5%
(c) license money deposite
5%
(d) earnest and security deposits
⭐સર્જન બેચની સંપૂર્ણ માહિતી 🔻
🔗https://www.youtube.com/live/oVq8BYsAPIc?feature=shared
🏆 તમારી Planning Assistantની તૈયારીના અંતિમ પ્રહાર માટે
🌟સર્જન બેચ🌟
🏆Special Batch For 3 Subjects
1.Preparation and study of Maps/Plans
2.Ecology and Environment
3. Seismic Engineering and Disaster Management
આજે જ સર્જન બેચમાં જોડાવા માટે,
Download Websankul Civil Engineering Live Application
https://oxzlwa.courses.store/457095?utm_source%3Dother%26utm_medium%3Dtutor-course-referral%26utm_campaign%3Dcourse-overview-webapp
📱વધુ માહિતી માટે સંપર્ક કરો
7201866333
🔗https://www.youtube.com/live/oVq8BYsAPIc?feature=shared
🏆 તમારી Planning Assistantની તૈયારીના અંતિમ પ્રહાર માટે
🌟સર્જન બેચ🌟
🏆Special Batch For 3 Subjects
1.Preparation and study of Maps/Plans
2.Ecology and Environment
3. Seismic Engineering and Disaster Management
આજે જ સર્જન બેચમાં જોડાવા માટે,
Download Websankul Civil Engineering Live Application
https://oxzlwa.courses.store/457095?utm_source%3Dother%26utm_medium%3Dtutor-course-referral%26utm_campaign%3Dcourse-overview-webapp
📱વધુ માહિતી માટે સંપર્ક કરો
7201866333
👍1
RFWL-15-2021-22.pdf
394.8 KB
🛑Waiting List Out for Advt.15/2021-22 NWRWSKD AE- Class -2