The part of a door which holds the shutter in position is
Anonymous Quiz
6%
Panel
44%
Frame
45%
Holdfast
5%
Stile
❀2
The property of soil that governs the flow of water through its voids is called
Anonymous Quiz
10%
Compressibility
12%
Capillarity
76%
Permeability
2%
Plasticity
❀1
The IRC specifies that the camber for cement concrete roads should be about
Anonymous Quiz
22%
1 in 20
41%
1 in 33
29%
1 in 50
8%
1 in 60
❀2πŸ‘Œ1
The difference in elevation between two points is known as
Anonymous Quiz
31%
Reduced level
6%
Back sight
40%
Rise and fall
23%
Vertical distance
❀3
The improvement of soil by vibration is mainly effective in
Anonymous Quiz
22%
Clayey soil
14%
Silty soil
61%
Sandy soil
2%
Peaty soil
❀4
The member provided above doors and windows to support the load of masonry above is called
Anonymous Quiz
13%
Sill
74%
Lintel
10%
Sunshade
3%
Coping
❀2
The test used to determine the shape of coarse aggregates is
Anonymous Quiz
8%
Abrasion test
8%
Crushing test
82%
Flakiness test
3%
Impact test
The estimate prepared for additional works not included in the original estimate is called
Anonymous Quiz
20%
Revised estimate
9%
Detailed estimate
10%
Abstract estimate
61%
Supplementary estimate
❀1
πŸ”₯General Studies 2026
Selection Oriented Programme

πŸ‘‰πŸ»4999/- ❌
FLAT 60% Off

πŸ‘‰πŸ»Only @ 1999/- βœ…

πŸ‘‰πŸ» Validity Till Your Exam

πŸ“Join Batch Now


https://websankulcivilengineering.akamai.net.in/new-courses/86

πŸ“±Contact Us
72018 66333
❀3
βœ…DAILY QUESTION PRACTICE QUIZ FOR GSSSB-ADDITIONAL ASSISTANT ENGINEERπŸ‘·πŸ»-824 POSTS-(ADVT NO. :-303/202526)
The method of plane table surveying used when the instrument station is already plotted is
Anonymous Quiz
32%
Resection
28%
Intersection
21%
Traversing
19%
Radiation
In PERT analysis, the measure of uncertainty in project completion time is expressed by
Anonymous Quiz
37%
Expected time
26%
Variance
18%
Total float
20%
Slack time