WebSankul Civil Engineering ๐Ÿ‘ทโ€โ™‚๏ธ ๐Ÿ—๏ธ
10.6K subscribers
4.08K photos
144 videos
937 files
4.19K links
For Enquiry : 72018 66333

Social Platforms :

YouTube : https://bit.ly/WebSankulCivilEngineering

Instagram : https://bit.ly/CivilEngineeringWebSankul
Download Telegram
The ratio of change in volume to original volume of a body subjected to stress is called
Anonymous Quiz
6%
Linear strain
9%
Lateral strain
82%
Volumetric strain
3%
Shear strain
In a beam subjected to uniformly distributed load over the entire span, the bending moment diagram is
Anonymous Quiz
11%
Rectangular
15%
Triangular
73%
Parabolic
1%
Circular
โค1
The method of surveying used for locating an inaccessible point by intersecting rays from two stations is
Anonymous Quiz
58%
Intersection
24%
Resection
13%
Radiation
5%
Traversing
In network planning, the free float of an activity is the time available without affecting
Anonymous Quiz
41%
Succeeding activity
13%
Critical path
38%
Project completion time
8%
Preceding activity
โค1
The failure of a long column by lateral deflection under compressive load is known as
Anonymous Quiz
9%
Crushing
82%
Buckling
7%
Shearing
2%
Torsion
The soil classification system based on particle size distribution and plasticity characteristics is
Anonymous Quiz
51%
IS soil classification
6%
USDA classification
10%
Textural classification
32%
AASHTO classification
The portion of a window provided above the lintel for ventilation is called
Anonymous Quiz
20%
Sill
11%
Mullion
14%
Transom
56%
Ventilator
The pavement layer which directly rests on the prepared subgrade is called
Anonymous Quiz
15%
Wearing course
6%
Binder course
27%
Base course
52%
Sub-base course
๐Ÿ‘3โค1๐ŸŽ‰1
The correction applied when the line of sight is not truly horizontal in levelling is
Anonymous Quiz
23%
Curvature correction
19%
Refraction correction
50%
Collimation correction
7%
Benchmark correction
โค4
The process of improving bearing capacity of soil by replacing weak soil with stronger material is called
Anonymous Quiz
46%
Soil stabilization
46%
Soil replacement
7%
Compaction
1%
Grouting
The course provided at plinth level to prevent dampness is known as
Anonymous Quiz
4%
Coping
5%
String course
91%
Damp proof course
1%
Weathering course
The measurement of centering and shuttering work is usually taken in
Anonymous Quiz
13%
Cubic metre
28%
Running metre
59%
Square metre
0%
Kilogram
The compaction of soil in the laboratory is determined by
Anonymous Quiz
11%
Direct shear test
26%
CBR test
30%
Consolidation test
33%
Proctor test
๐Ÿ‘2
In a continuous beam, redistribution of moment occurs due to
Anonymous Quiz
4%
Creep
7%
Yielding
8%
Temperature
81%
All of these
๐Ÿ›‘เช†เชœเซ‡ เชธเชพเช‚เชœเซ‡ 7 เชตเชพเช—เซ‡

๐Ÿ‘‰๐ŸปGPSC 2026
General Studies

๐Ÿ“ƒ100 Marks เชจเซ€ Smart & Disciplined Preparation

โœ…เชœเชพเชฃเซ‹ เชธเช‚เชชเซ‚เชฐเซเชฃ เชฎเชพเชนเชฟเชคเซ€

๐Ÿ”ฅGS เชตเช—เชฐ Selection เชจเชนเซ€ เชฅเชพเชฏ.

๐Ÿ—“๏ธDate : 05/02/2026
โฐTime : 07:00 PM

๐Ÿ”นLive Session Link


https://www.youtube.com/live/6qnJ56J0WcM?si=_Hlf1A_Mmoj8hTw9

Contact Us 72018 66333
โค2