The main cause of eutrophication of water bodies is
Anonymous Quiz
49%
Excess nutrients
32%
Thermal pollution
11%
Acid rain
8%
Oil spills
The estimate prepared for routine minor works annually is
Anonymous Quiz
6%
Original estimate
6%
Revised estimate
68%
Annual repair estimate
20%
Supplementary estimate
The fundamental natural period of a building increases with
Anonymous Quiz
45%
Increase in stiffness
18%
Reduction in mass
25%
Increase in damping
12%
Increase in height
👍1
The function of road camber is to
Anonymous Quiz
3%
Reduce speed
14%
Increase pavement life only
82%
Improve surface drainage
1%
Improve aesthetics
Contours never cross each other except in case of
Anonymous Quiz
67%
Vertical cliff
20%
Uniform slope
9%
Valley
5%
Ridge
The compression index of soil is obtained from
Anonymous Quiz
12%
Direct shear test
61%
Consolidation test
17%
Proctor test
9%
CBR test
Environmental monitoring is required to
Anonymous Quiz
28%
Increase project speed
66%
Ensure compliance
4%
Reduce labor cost
2%
Avoid planning
Internal rate of return represents
Anonymous Quiz
13%
Fixed interest
18%
Inflation rate
8%
Bank lending rate
61%
Discount rate with zero NPV
A closed traverse is preferred when
Anonymous Quiz
33%
High accuracy is required
29%
Area is very small
8%
Only angles measured
30%
Survey ends at unknown point
🎉1
Liquidity index greater than one indicates soil is
Anonymous Quiz
35%
Plastic
24%
Semi-solid
36%
Flowing
5%
Dry
Sustainable transport aims to
Anonymous Quiz
2%
Increase fuel use
27%
Promote private vehicles
5%
Increase road width
66%
Reduce emissions
❤2
Contingency provision in estimates usually ranges between
Anonymous Quiz
10%
0.5–1%
35%
2–3%
48%
3–5%
7%
10–15%
Torsional irregularity in buildings arises due to
Anonymous Quiz
5%
Symmetric layout
85%
Eccentric mass distribution
5%
Equal column spacing
4%
Uniform stiffness
❤1
Design speed of a road is selected based on
Anonymous Quiz
21%
Economic considerations
10%
Roadside development
9%
Traffic police norms
59%
Maximum speed of vehicle
❤3
The contour interval is chosen based on
Anonymous Quiz
70%
Purpose of survey
6%
Soil type
4%
Climate
20%
Map size
❤1
Differential settlement causes
Anonymous Quiz
33%
Uniform deformation
12%
Improved bearing
5%
Increased safety
51%
Structural distress
❤1
Noise pollution is measured on
Anonymous Quiz
8%
Linear scale
12%
Percentage scale
30%
Arbitrary scale
50%
Logarithmic scale
❤1
Dummy activities in CPM indicate
Anonymous Quiz
3%
Actual work
18%
Delay in project
6%
Resource use
72%
Logical relationship
🔥GENERAL STUDIES FOUNDATION BATCH
✅SPECIALLY DESIGNED FOR
🔹(GPSSB) WORK ASSISTANT
🔹 ( GPSSB) AAE
👉🏻Only @3499/-
for 6 months validity
📍Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/57
📱CONTACT US
72018 66333
✅SPECIALLY DESIGNED FOR
🔹(GPSSB) WORK ASSISTANT
🔹 ( GPSSB) AAE
👉🏻Only @3499/-
for 6 months validity
📍Join Batch Now
https://websankulcivilengineering.akamai.net.in/new-courses/57
📱CONTACT US
72018 66333
❤1