Castigliano's theorem is used to determine
Anonymous Quiz
7%
Stress
71%
Deflection
11%
Shear
11%
Torsion
The measure of acidity or alkalinity in water is
Anonymous Quiz
8%
Turbidity
25%
Hardness
63%
pH
4%
BOD
The consistency index of soil is
Anonymous Quiz
14%
(LL β PL)
29%
(W β PL)/(LL β PL)
47%
(LL β W)/(LL β PL)
10%
(PL β W)/(LL β PL)
The traffic density equals
Anonymous Quiz
14%
Speed Γ Time
29%
Speed / Volume
35%
Volume Γ Speed
22%
Volume / Speed
β€4π1
The strength of concrete is indirectly proportional to
Anonymous Quiz
9%
Curing
20%
Aggregate grading
67%
W/C ratio
4%
Mixing time
β€2
The stiffness matrix method is also called
Anonymous Quiz
13%
Force method
70%
Displacement method
11%
Virtual work method
6%
Plastic method
Differential settlement occurs due to
Anonymous Quiz
6%
Uniform load
28%
High moisture content
2%
Cementation
65%
Unequal soil conditions
The basic parameter for geometric design is
Anonymous Quiz
16%
Axle load
17%
Number of lanes
48%
Design speed
19%
Traffic volume
β€3
β
DAILY QUESTION PRACTICE QUIZ FOR GSSSB-PLANNING ASSISTANTπ·π»-100 POSTS-(ADVT NO. :331/202526)
π1
The pollutant responsible for depletion of ozone layer is
Anonymous Quiz
10%
CO
71%
CFCs
12%
NHβ
7%
SOβ
A valuation report is prepared by
Anonymous Quiz
6%
Contractor
2%
Architect
86%
Engineer or valuer
5%
Surveyor
β€1
Soft storey failure occurs due to
Anonymous Quiz
6%
Increasing mass
9%
High ductility
16%
High stiffness
69%
Sudden change in stiffness
β€1
The major cause of rutting in bituminous pavement is
Anonymous Quiz
3%
Air pressure
34%
Water stagnation
19%
Surface polishing
44%
Excessive loading
Bowditch rule is applied when
Anonymous Quiz
10%
Angular work is precise
8%
Linear work is precise
78%
Both angular and linear errors are equal
4%
Magnetic declination is large
β€1
Reuse and recycle come under
Anonymous Quiz
3%
Food chain
15%
Water quality index
6%
Building code
76%
Solid waste hierarchy
Earned Value Management helps in
Anonymous Quiz
1%
Pavement layer identification
48%
Tracking project progress using subjective judgment
12%
Project performance monitoring
39%
Predicting delays without considering actual work done
β€2